Skip to content

test(dev): match Vite's renamed full-reload log - #10547

Merged
graphite-app[bot] merged 1 commit into
mainfrom
test/dev-full-reload-needed-log
Jul 30, 2026
Merged

graphite-app[bot] merged 1 commit into
mainfrom
test/dev-full-reload-needed-log

Conversation

@shulaoda

Copy link
Copy Markdown
Member

hmr-accept-outside-circular fails on main on every platform (ubuntu 20/22/24, macos, windows) and therefore on every open PR. No rolldown commit is involved.

The dev-server suite runs against an unpinned Vite checkout: scripts/src/setup-vite/checkout.ts clones rolldown-canary and rebases it onto the latest origin/main on every run, so upstream lands here the moment it merges. Between the last green run (vite 35a9946f6) and the first red one (vite 01ccd3240), vitejs/vite#23106 went in.

That PR routes every reload decision through requestFullReload, which reports to the server instead of navigating so the rebuild finishes before the page moves. It renamed the log line along the way:

-    this.logger.debug(`full reload: ${reason}`)
+    this.logger.debug(`full reload needed: ${reason}`)

The spec waits on that line to check the reload is attributed to the circle and not to a missing boundary (main self-accepts, so a plain no-boundary reason would be a bug). Its regex anchors full reload: directly against circular, so the inserted word breaks the match and untilBrowserLogAfter times out.

@netlify

netlify Bot commented Jul 30, 2026 •

Copy link
Copy Markdown

✅ Deploy Preview for rolldown-rs canceled.

Name Link
🔨 Latest commit c170729
🔍 Latest deploy log https://app.netlify.com/projects/rolldown-rs/deploys/6a6b76308ec7ed0008d7e638

sapphi-red commented Jul 30, 2026 •

Copy link
Copy Markdown
Member

Merge activity

  • Jul 30, 4:04 PM UTC: The merge label 'graphite: merge-when-ready' was detected. This PR will be added to the Graphite merge queue once it meets the requirements.
  • Jul 30, 4:04 PM UTC: sapphi-red added this pull request to the Graphite merge queue.
  • Jul 30, 4:13 PM UTC: Merged by the Graphite merge queue.

`hmr-accept-outside-circular` fails on main on every platform (ubuntu 20/22/24, macos, windows) and therefore on every open PR. No rolldown commit is involved.

The dev-server suite runs against an unpinned Vite checkout: `scripts/src/setup-vite/checkout.ts` clones `rolldown-canary` and rebases it onto the latest `origin/main` on every run, so upstream lands here the moment it merges. Between the last green run (vite `35a9946f6`) and the first red one (vite `01ccd3240`), [vitejs/vite#23106](vitejs/vite#23106) went in.

That PR routes every reload decision through `requestFullReload`, which reports to the server instead of navigating so the rebuild finishes before the page moves. It renamed the log line along the way:

```diff
-    this.logger.debug(`full reload: ${reason}`)
+    this.logger.debug(`full reload needed: ${reason}`)
```

The spec waits on that line to check the reload is attributed to the circle and not to a missing boundary (`main` self-accepts, so a plain no-boundary reason would be a bug). Its regex anchors `full reload:` directly against `circular`, so the inserted word breaks the match and `untilBrowserLogAfter` times out.
@graphite-app
graphite-app Bot force-pushed the test/dev-full-reload-needed-log branch from a96dc69 to c170729 Compare July 30, 2026 16:05
@graphite-app
graphite-app Bot merged commit c170729 into main Jul 30, 2026
34 checks passed
@graphite-app
graphite-app Bot deleted the test/dev-full-reload-needed-log branch July 30, 2026 16:13
@rolldown-guard rolldown-guard Bot mentioned this pull request Aug 3, 2026
shulaoda added a commit that referenced this pull request Aug 3, 2026
## [1.2.2] - 2026-08-03

### 🚀 Features

- code-splitting: support inlining of shared deps in dynamic entries (#10526) by @nicolo-ribaudo
- plugin: time the user callbacks configured on the options (#10509) by @IWANABETHATGUY

### 🐛 Bug Fixes

- dev: force `cleanDir` off in dev mode (#10579) by @shulaoda
- dev: keep `?rolldown-lazy` proxy ids out of user `resolveId` hooks (#10580) by @btea
- initialize re-exported wrapped ESM modules at the entry chunk (#10567) by @hyfdev
- link: resolve circular star reexports as null (#10445) by @Nic-Polumeyv
- transform: transformer gate skips newer syntax that oxc can lower (#10564) by @sekyungk
- code-splitting: materialize consumer-local barrel routing when the order-wrap plan is empty (#10544) by @hyfdev
- plugin: measure plugin hooks in JavaScript, report them from Rust (#10508) by @IWANABETHATGUY
- plugin: include external dynamic imports in chunk metadata (#10557) by @hyfdev
- plugin: report plugin timings after closeBundle has run (#10521) by @IWANABETHATGUY
- browser: avoid using node builtin modules (#10542) by @sapphi-red

### 🚜 Refactor

- plugin: give the build's own clocks their own type (#10520) by @shulaoda

### 📚 Documentation

- correct stale `buildStart` comment in `ScanStageCache::merge` (#10577) by @shulaoda
- update outdated pluginutils references (#10574) by @dogledogle

### ⚡ Performance

- external: drop the runtime import from chunks that never wrap (#10517) by @IWANABETHATGUY
- plugin: clock the build only when it is being measured (#10558) by @IWANABETHATGUY

### 🧪 Testing

- vite-tests: drop the dead `@rolldown/pluginutils` pnpm override (#10575) by @IWANABETHATGUY
- transform: group the transform-target fixtures and say why each exists (#10569) by @IWANABETHATGUY
- dev: fix hmr-hot-update-hook-vite fixture on Windows (#10565) by @h-a-n-a
- dev: match Vite's renamed full-reload log (#10547) by @shulaoda

### ⚙️ Miscellaneous Tasks

- deps: update napi (#10576) by @renovate[bot]
- deps: bump `@napi-rs/wasm-runtime` to 1.2.2 (#10570) by @shulaoda
- deps: update npm packages (#10583) by @renovate[bot]
- deps: update dependency rolldown-plugin-dts to ^0.28.0 (#10588) by @renovate[bot]
- deps: update taiki-e/install-action action to v2.85.5 (#10587) by @renovate[bot]
- deps: update codspeedhq/action action to v5 (#10584) by @renovate[bot]
- deps: update github actions (#10582) by @renovate[bot]
- deps: update rust crates (#10581) by @renovate[bot]
- deps: update dependency vite-plus to v0.2.7 (#10568) by @renovate[bot]
- deps: update dependency rolldown-plugin-dts to v0.27.14 (#10531) by @renovate[bot]
- deps: update pnpm to v11.17.0 (#10571) by @renovate[bot]
- deps: update @napi-rs/wasm-runtime to 1.2.1 (#10545) by @sapphi-red

### ❤️ New Contributors

* @sekyungk made their first contribution in [#10564](#10564)
* @nicolo-ribaudo made their first contribution in [#10526](#10526)

Co-authored-by: shulaoda <165626830+shulaoda@users.noreply.github.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants