Completion time of a given process in round robin
We are given n-processes with their completion times in form of an array. We need to find the time instant when a given process p ends if the scheduling process is round robin and time slice is 1-sec.
note : Array index start with 0.
Examples :
Input : arr[] = {3, 2, 4, 2}, p = 1
Output : Completion time = 6
Explanation : Snap of process for every second is as:
Time | Process Array
0 | {3, 2, 4, 2}
1 | {2, 2, 4, 2}
2 | {2, 1, 4, 2}
3 | {2, 1, 3, 2}
4 | {2, 1, 3, 1}
5 | {1, 1, 3, 1}
6 | {1, 0, 3, 1}
Input : arr[] = {2, 4, 1, 3}, p = 2
Output :Completion time = 3
Explanation : Snap of process for every second is as:
Time | Process Array
0 | {2, 4, 1, 3}
1 | {1, 4, 1, 3}
2 | {1, 3, 1, 3}
3 | {1, 3, 0, 3}
Brute Force :The basic approach for solving this problem is to apply round robin algorithm with time slice 1. But the time complexity of that approach will be O(ΣAi) i.e. summation of all process’s time, which is quite high.
Efficient Approach: The idea is based on below observations.
1) All processes with CPU time less than arr[p] would complete before arr[p]. We simply need to add time of these processes.
2) We also need to add time of arr[p].
3) For every process x with CPU time more than arr[p], two cases arise :
…..(i) If x is on left of arr[p] (scheduled before arr[p]), then this process takes arr[p] time of CPU before p finishes.
…..(ii) If x is on right of arr[p] (scheduled after arr[p]), then this process takes arr[p]-1 time of CPU before p finishes.
Algorithm :
time_req = 0;
// Add time for process on left of p
// (Scheduled before p in a round of
// 1 unit time slice)
for (int i=0; i<p; i++)
{
if (arr[i] < arr[p])
time_req += arr[i];
else
time_req += arr[p];
}
// step 2 : Add time of process p
time_req += arr[p];
// Add time for process on right
// of p (Scheduled after p in
// a round of 1 unit time slice)
for (int i=p+1; i<n; i++)
{
if (arr[i] < arr[p])
time_req += arr[i];
else
time_req += arr[p]-1;
}
C++
// Program to find end time of a process // p in round robin scheduling with unit // time slice. #include <bits/stdc++.h> using namespace std; // Returns completion time of p. int completionTime(int arr[], int n, int p) { // Initialize result int time_req = 0; // Step 1 : Add time of processes on left // of p (Scheduled before p) for (int i = 0; i < p; i++) { if (arr[i] < arr[p]) time_req += arr[i]; else time_req += arr[p]; } // Step 2 : Add time of p time_req += arr[p]; // Step 3 : Add time of processes on right // of p (Scheduled after p) for (int i = p + 1; i < n; i++) { if (arr[i] < arr[p]) time_req += arr[i]; else time_req += arr[p] - 1; } return time_req; } // driver program int main() { int arr[] = {3, 5, 2, 7, 6, 1}; int n = sizeof(arr) / sizeof(arr[0]); int p = 2; cout << "Completion time = " << completionTime(arr, n, p); return 0; } |
Java
// Program to find end time of a process // p in round robin scheduling with unit // time slice. class GFG { // Returns completion time of p. static int completionTime(int arr[], int n, int p) { // Initialize result int time_req = 0; // Step 1 : Add time of processes on left // of p (Scheduled before p) for (int i = 0; i < p; i++) { if (arr[i] < arr[p]) time_req += arr[i]; else time_req += arr[p]; } // Step 2 : Add time of p time_req += arr[p]; // Step 3 : Add time of processes on right // of p (Scheduled after p) for (int i = p + 1; i < n; i++) { if (arr[i] < arr[p]) time_req += arr[i]; else time_req += arr[p] - 1; } return time_req; } // Driver code public static void main (String[] args) { int arr[] = {3, 5, 2, 7, 6, 1}; int n =arr.length;; int p = 2; System.out.print("Completion time = "+ completionTime(arr, n, p)); } } // This code is contributed by Anant Agarwal. |
Python
# Program to find end time of a process # p in round robin scheduling with unit # time slice. # Returns completion time of p. def completionTime(arr, n, p) : # Initialize result time_req = 0 # Step 1 : Add time of processes on # left of p (Scheduled before p) for i in range(0, p): if (arr[i] < arr[p]): time_req += arr[i] else: time_req += arr[p] # Step 2 : Add time of p time_req += arr[p] # Step 3 : Add time of processes on # right of p (Scheduled after p) for i in range(p + 1, n): if (arr[i] < arr[p]): time_req += arr[i] else: time_req += arr[p] - 1 return time_req # driver program arr = [3, 5, 2, 7, 6, 1] n = len(arr) p = 2print("Completion time =", completionTime(arr, n, p)) # This code is contributed by # Smitha Dinesh Semwal |
C#
// C# program to find end time of a process // p in round robin scheduling with unit // time slice. using System; class GFG { // Returns completion time of p. static int completionTime(int []arr, int n, int p) { // Initialize result int time_req = 0; // Step 1 : Add time of processes // on left of p (Scheduled before p) for (int i = 0; i < p; i++) { if (arr[i] < arr[p]) time_req += arr[i]; else time_req += arr[p]; } // Step 2 : Add time of p time_req += arr[p]; // Step 3 : Add time of processes on // right of p (Scheduled after p) for (int i = p + 1; i < n; i++) { if (arr[i] < arr[p]) time_req += arr[i]; else time_req += arr[p] - 1; } return time_req; } // Driver code public static void Main () { int []arr = {3, 5, 2, 7, 6, 1}; int n =arr.Length;; int p = 2; Console.WriteLine("Completion time = "+ completionTime(arr, n, p)); } } // This code is contributed by vt_m. |
PHP
<?php // Program to find end time // of a process p in round // robin scheduling with // unit time slice. // Returns completion time of p. function completionTime($arr, $n, $p) { // Initialize result $time_req = 0; // Step 1 : Add time of processes on // left of p (Scheduled before p) for ($i = 0; $i < $p; $i++) { if ($arr[$i] < $arr[$p]) $time_req += $arr[$i]; else $time_req += $arr[$p]; } // Step 2 : Add time of p $time_req += $arr[$p]; // Step 3 : Add time of processes on // right of p (Scheduled after p) for ($i = $p + 1; $i < $n; $i++) { if ($arr[$i] < $arr[$p]) $time_req += $arr[$i]; else $time_req += $arr[$p] - 1; } return $time_req; } // Driver Code $arr = array(3, 5, 2, 7, 6, 1); $n = count($arr); $p = 2; echo"Completion time = " , completionTime($arr, $n, $p); // This code is contributed by anuj_67. ?> |
Output :
Completion time = 9
Time Complexity : O(n)
Recommended Posts:
- Program for Round Robin scheduling | Set 1
- Round Robin Scheduling with different arrival times
- Maximum removal from array when removal time >= waiting time
- Introduction of Process Management
- Process Schedulers in Operating System
- Minimum cost to process m tasks where switching costs
- Why is it faster to process sorted array than an unsorted array ?
- Duplicates in an array in O(n) time and by using O(1) extra space | Set-3
- Constant time range add operation on an array
- Find duplicates in O(n) time and O(1) extra space | Set 1
- Maximum Length Bitonic Subarray | Set 1 (O(n) time and O(n) space)
- Find a sorted subsequence of size 3 in linear time
- Maximum Length Bitonic Subarray | Set 2 (O(n) time and O(1) Space)
- Amazon Interview Experience | Set 389 (On -Campus for Full Time)
- Print left rotation of array in O(n) time and O(1) space
If you like GeeksforGeeks and would like to contribute, you can also write an article using contribute.geeksforgeeks.org or mail your article to contribute@geeksforgeeks.org. See your article appearing on the GeeksforGeeks main page and help other Geeks.
Please Improve this article if you find anything incorrect by clicking on the "Improve Article" button below.
Improved By : vt_m



