Given N nodes on a 2-D plane represented as (xi, yi). The nodes are said to be connected if the manhattan distance between them is 1. You can connect two nodes that are not connected at the cost of euclidean distance between them. The task is to connect the graph such that every node has a path from any node with minimum cost.
Examples:
Input: N = 3, edges[][] = {{1, 1}, {1, 1}, {2, 2}, {3, 2}}
Output: 1.41421
Since (2, 2) and (2, 3) are already connected.
So we try to connect either (1, 1) with (2, 2)
or (1, 1) with (2, 3) but (1, 1) with (2, 2)
yields the minimum cost.Input: N = 3, edges[][] = {{1, 1}, {2, 2}, {3, 3}}
Output: 2.82843
Approach: The brute force approach is to connect each node with every other node and similarly for the other N nodes but in the worst case the time complexity will be NN.
The other way is to find the cost of every pair of vertices with the euclidean distance and those pairs which are connected will have the cost as 0.
After knowing the cost of each pair we will apply the Kruskal Algorithm for the minimum spanning tree and it will yield the minimum cost for connecting the graph. Note that for Kruskal Algorithm, you have to have the knowledge of Disjoint Set Union (DSU).
Below is the implementation of the above approach:
// C++ implentation of the approach #include <bits/stdc++.h> using namespace std; // Max number of nodes given const int N = 500 + 10; // arr is the parent array // sz is the size of the // subtree in DSU int arr[N], sz[N]; // Function to initilize the parent // and size array for DSU void initialize() { for (int i = 1; i < N; ++i) { arr[i] = i; sz[i] = 1; } } // Function to return the // parent of the node int root(int i) { while (arr[i] != i) i = arr[i]; return i; } // Function to perform the // merge operation void unin(int a, int b) { a = root(a); b = root(b); if (a != b) { if (sz[a] < sz[b]) swap(a, b); sz[a] += sz[b]; arr[b] = a; } } // Function to return the minimum cost required double minCost(vector<pair<int, int> >& p) { // Number of points int n = (int)p.size(); // To store the cost of every possible pair // as { cost, {to, from}}. vector<pair<double, pair<int, int> > > cost; // Calculating the cost of every possible pair for (int i = 0; i < n; ++i) { for (int j = 0; j < n; ++j) { if (i != j) { // Getting Manhattan distance int x = abs(p[i].first - p[j].first) + abs(p[i].second - p[j].second); // If the distance is 1 the cost is 0 // or already connected if (x == 1) { cost.push_back({ 0, { i + 1, j + 1 } }); cost.push_back({ 0, { j + 1, i + 1 } }); } else { // Calculating the euclidean distance int a = p[i].first - p[j].first; int b = p[i].second - p[j].second; a *= a; b *= b; double d = sqrt(a + b); cost.push_back({ d, { i + 1, j + 1 } }); cost.push_back({ d, { j + 1, i + 1 } }); } } } } // Krushkal Algorithm for Minimum // spanning tree sort(cost.begin(), cost.end()); // To initialize the size and // parent array initialize(); double ans = 0.00; for (auto i : cost) { double c = i.first; int a = i.second.first; int b = i.second.second; // If the parents are different if (root(a) != root(b)) { unin(a, b); ans += c; } } return ans; } // Driver code int main() { // Vector pairs of points vector<pair<int, int> > points = { { 1, 1 }, { 2, 2 }, { 2, 3 } }; // Function calling and printing // the answer cout << minCost(points); return 0; } |
1.41421
Attention reader! Don’t stop learning now. Get hold of all the important DSA concepts with the DSA Self Paced Course at a student-friendly price and become industry ready.
Recommended Posts:
- Minimum Cost using Dijkstra by reducing cost of an Edge
- Minimum Cost of Simple Path between two nodes in a Directed and Weighted Graph
- Minimum Cost Path in a directed graph via given set of intermediate nodes
- Minimum Cost Maximum Flow from a Graph using Bellman Ford Algorithm
- Maximum cost path in an Undirected Graph such that no edge is visited twice in a row
- Minimize cost to color all the vertices of an Undirected Graph
- Minimize cost to color all the vertices of an Undirected Graph using given operation
- Graph implementation using STL for competitive programming | Set 2 (Weighted graph)
- Detect cycle in the graph using degrees of nodes of graph
- Convert the undirected graph into directed graph such that there is no path of length greater than 1
- Maximum number of edges that N-vertex graph can have such that graph is Triangle free | Mantel's Theorem
- Convert undirected connected graph to strongly connected directed graph
- Find the minimum cost to reach destination using a train
- Minimum Cost Path with Left, Right, Bottom and Up moves allowed
- Minimum cost to connect weighted nodes represented as array
- Minimum cost to connect all cities
- Minimum cost to reach the top of the floor by climbing stairs
- Minimum cost path from source node to destination node via an intermediate node
- Minimum odd cost path in a matrix
- Choose atleast two elements from array such that their GCD is 1 and cost is minimum
If you like GeeksforGeeks and would like to contribute, you can also write an article using contribute.geeksforgeeks.org or mail your article to contribute@geeksforgeeks.org. See your article appearing on the GeeksforGeeks main page and help other Geeks.
Please Improve this article if you find anything incorrect by clicking on the "Improve Article" button below.

