Track for WARMAN is ready. Is on the 3rd floor, near to the dynamics lab.
Showing posts with label Projects. Show all posts
Showing posts with label Projects. Show all posts
Thursday, March 13, 2008
Tuesday, September 18, 2007
Tuesday structural tute.
This is the hardest bridge on Tuesday structural tute class.
carried max 100kg+!!!
can even carried 2 big guys.
but did not really tested what was the actual load it could carry.
simple truss design. cool huh?
carried max 100kg+!!!
can even carried 2 big guys.
but did not really tested what was the actual load it could carry.
simple truss design. cool huh?
Engineered by
EJinGs
at
7:28 pm
0
comments
Labels: Projects
Subscribe to:
Posts (Atom)

