Jump to content

Hengchun line

From Wikipedia, the free encyclopedia
Hengchun line
Overview
Native name恆春線
StatusPlanned, expected to finish in mid-2020s
OwnerTaiwan Railway Administration
LocaleHengchun, Pingtung County, Taiwan
Termini
Service
TypeHeavy rail
SystemTaiwan Railway
Technical
Track gauge3 ft 6 in (1,067 mm) narrow gauge
Route map
Hengchun line
Neishi
Fangshanxin
Fenggang
Checheng
Wuliting
Hengchun

The Hengchun line (Chinese: 恆春線; Pe̍h-ōe-jī: Hêng-chhun Sòaⁿ) is a planned branch line of Taiwan Railway South-link line which plans to connect Taiwan's southern capital Kaohsiung to Kenting, a popular tourist destination located in Hengchun. Express train service that connects Xinzuoying Station, the major hub for both Taiwan High Speed Rail and Taiwan Railway trains, to Hengchun is also planned. Construction started in 2017.

History

[edit]
Hengchun Line Route Map.
Hengchun line route map

In 1876, the governor of Fujian Province Ding Ri-chang (zh) proposed a railway line running from Keelung to Hengchun, and under a 1924 plan proposed during Japanese rule, the Hengchun line was planned to branch off from the Pingtung line, but that plan was shelved in 1927 due to budgetary constraints.

The need to construct the Hengchun line became apparent with the opening of Kenting National Park in 1984 as well as the fact that Hengchun Airport (opened in 2004) is often affected by strong winds. The washing away of several bridges of Provincial Highway 1 during Typhoon Haitang in 2005 further highlighted the importance of the need for the Hengchun line. In 2002 a feasibility study was completed, but in 2005 the Ministry of Transportation and Communications (MOTC) recommended that coach transportation be used entirely from Fangliao railway station to Kenting National Park. After further lobbying from Hengchun residents, the MOTC conducted a revised feasibility study in 2014, this time including express service using TRA rolling stock from Xinzuoying Station to Hengchun Station. The latter study was approved by the Executive Yuan in December 2015. Construction started in 2017, and it is expected to finish in the mid-2020s. A branch line leading to the National Museum of Marine Biology and Aquarium is currently under discussion.

Stations

[edit]
NameChineseTaiwaneseHakkaTransfers and notesLocation
Neishi內獅Lāi-saiNui-sṳ̂ Taiwan Railway South-link line FangshanPingtung
County
Fangshanxin枋山新Pang-soaⁿ-sinPiông-sân-sîn
Fenggang楓港Hong-kángPùng-kóng
Checheng車城Chhia-siâⁿChhâ-sàng Checheng
Wuliting五里亭Gō͘-lí-tîngŃg-lí-tin Hengchun Airport (HCN) Hengchun
Hengchun恆春Hêng-chhunHèn-tshûn

References

[edit]