High-speed rail in Germany

Construction of the first high-speed rail in Germany began shortly after that of the French LGVs (lignes Ă grande vitesse, high-speed lines). However, legal battles caused significant delays, so that the German Intercity-Express (ICE) trains were deployed ten years after the TGV network was established. Germany has around 1,658 kilometers (1,030 miles) of high speed lines.[1]
InterCityExpress
[edit]The first regularly scheduled ICE trains ran on 2 June 1991 from Hamburg-Altona via Hamburg Hbf â Hannover Hbf â Kassel-WilhelmshĂśhe â Fulda â Frankfurt Hbf â Mannheim Hbf and Stuttgart Hbf toward MĂźnchen Hbf on the new ICE line 6. The ICE network is more tightly integrated with pre-existing lines and trains as a result of the different settlement structure in Germany,[clarification needed] which has almost twice the population density of France. ICE trains reached destinations in Austria and Switzerland soon after they entered service, taking advantage of the same voltage used in these countries. Starting in 2000, multisystem third-generation ICE trains entered the Netherlands and Belgium. The third generation of the ICE has a service speed of 330Â km/h (205Â mph) and has reached speeds up to 363Â km/h (226Â mph).
Admission of ICE trains onto French LGVs was applied for in 2001, and trial runs completed in 2005. Since June 2007, ICEs service Paris from Frankfurt and SaarbrĂźcken via the LGV Est.
Unlike the Shinkansen in Japan, Germany has experienced a fatal accident on a high-speed service. In the Eschede train disaster of 1998, a first generation ICE experienced catastrophic wheel failure while travelling at 200Â km/h (124Â mph) near Eschede, following complaints of excessive vibration. Of 287 passengers aboard, 101 people died and 88 were injured in the resulting derailment, which was made worse by the train colliding with a road bridge and causing it to collapse. The accident was the result of faulty wheel design and, following the crash, all ICE wheels of that design were redesigned and replaced.
International operators
[edit]Thalys trains began running in Germany in 1997, from the Belgian HSL 3 to Aachen and Cologne using the CologneâAachen high-speed railway. TGV POS trains began running in Germany in 2007, to Karlsruhe and Stuttgart using the MannheimâStuttgart and KarlsruheâBasel high-speed lines. Swiss SBB high-speed services using the New Pendolino from Frankfurt to Milan on the KarlsruheâBasel line started in 2017.[2]
Transrapid
[edit]Germany has developed the Transrapid, a maglev train system. The Transrapid reaches speeds up to 550Â km/h (342Â mph). The Emsland test facility, with a total length of 31.5Â km (19.6Â mi), operated until 2011 when it was closed and in 2012 its demolition was approved.[3] In China, Shanghai Maglev Train, a maglev based on Transrapid technology built in collaboration with Siemens has been operational since March 2004.
List of high-speed lines
[edit]| Line | Operating speed (max) | Length | Construction
began |
Construction completed or expected start of revenue services |
|---|---|---|---|---|
| HanoverâWĂźrzburg high-speed railway |
|
327Â km (203Â mi) | 1973 | 1991 |
| MannheimâStuttgart high-speed railway | 99Â km (62Â mi) | 1976 | 1991 | |
| HanoverâBerlin high-speed railway |
|
258Â km (160Â mi) | 1992 | 1998 |
| CologneâFrankfurt high-speed rail line |
|
180Â km (112Â mi) | 1995 | 2002 |
| CologneâAachen high-speed railway | 250Â km/h (155Â mph) | 70Â km (43Â mi) | 1997 | 2002 |
| NurembergâMunich high-speed railway | 300Â km/h (186Â mph) | 171Â km (106Â mi) | 1998 | 2006â2013 |
| NurembergâErfurt high-speed railway | 191Â km (119Â mi) | 1996 | 2017 | |
| ErfurtâLeipzig/Halle high-speed railway |
|
121Â km (75Â mi) | 1987 | 2015 |
| KarlsruheâBasel high-speed railway | 250Â km/h (155Â mph) | 182Â km (113Â mi) | 1987 | 1993â2031 |
| StuttgartâWendlingen high-speed railway | 25Â km (16Â mi) | 2012 | 2026 (expected)[4] | |
| WendlingenâUlm high-speed railway | 60Â km (37Â mi) | 2012 | 2022 | |
| Total operational | 1489 km (930.6 mi) |


Upgraded line
[edit]- CologneâAachen high-speed railway (upgraded line, 250Â km/h)
Partially new line
[edit]Part of these routes are new constructions that run along or close to the existing, or previous, route:
- HanoverâBerlin high-speed railway (partially new line, 250Â km/h on the new section, 160 and 200Â km/h on the existing sections)
- NurembergâErfurt high-speed railway (partially new line, 300Â km/h)
Fully new line
[edit]Completely new construction projects:
- CologneâFrankfurt high-speed rail line (new line, 300Â km/h)
- HanoverâWĂźrzburg high-speed railway (new line, 280Â km/h)
- MannheimâStuttgart high-speed railway (new line, 280Â km/h)
- ErfurtâLeipzig/Halle high-speed railway (new line, 300Â km/h)
- Nuremberg-Ingolstadt high-speed railway (new line, 300Â km/h)
- WendlingenâUlm high-speed railway (new line, 250Â km/h)
Lines not yet completed
[edit]- KarlsruheâBasel high-speed railway (new line, 250Â km/h, incomplete, sections under construction)
- StuttgartâWendlingen high-speed railway (new line, 250Â km/h, under construction)
- Vogelfluglinie (partially new line, partially being upgraded)
- LĂźbeckâHamburg railway (German part of Vogelfluglinie, to be upgraded to reach 200 km/h)
- LĂźbeckâPuttgarden railway (German part of Vogelfluglinie, to be electrified[5] to reach 200 km/h up from the current 160 km/h,[6] under construction)
- Fehmarn Belt Fixed Link (tunnel part, will replace the RødbyâPuttgarden ferry, 200 km/h, under construction, completion expected in 2028)[7]
- Sydbanen (Danish part, new tracks to be laid by 2021, to be electrified to reach 200 km/h by 2024, under construction)[8]
- CopenhagenâRingsted Line (Danish part, opened on 31 May 2019, currently operating at 180 km/h, upgrading to 250 km/h in 2023)
- Hanau-Gelnhausen high-speed railway (upgraded line, 230Â km/h, under construction)[9]
Lines planned
[edit]- FrankfurtâMannheim high-speed railway (new line, 300Â km/h, in planning)
- Hanover-Bielefeld high-speed railway (new line, 300Â km/h, in planning)
- Bielefeld-Hamm high-speed railway (upgraded line, 300Â km/h, in planning)[10]
- Nuremberg-WĂźrzburg high-speed railway (new line, 300Â km/h, in planning)
- Hanover-Hamburg high-speed railway/Hanover-Bremen high-speed railway (Y-shaped, partially new line, 160 and 300Â km/h on new sections, 160Â km/h on an existing section, in planning)
- Ulm-Augsburg high-speed railway (new line, 265Â km/h,[11] in planning)[12]
- Gelnhausen-Fulda high-speed rail (new line, 250Â km/h, in planning)
Travel times
[edit]| DB Intercity Express travel times between major stations1, 2 | ||||||||||||||||
| Amsterdam | Berlin | Brussels | Cologne | Dortmund | DĂźsseldorf | Frankfurt | Hamburg | Innsbruck | Munich | Paris | Stuttgart | Vienna | ZĂźrich | |||
| Amsterdam Centraal 4 | 5h 45min | N/a | 2h 37min | N/a | 2h 11min | 3h 55min | N/a | N/a | 7h 09min | N/a | 5h 03min | N/a | N/a | |||
| Berlin Hbf 5 | 5h 45min | N/a | 4h 12min | 3h 25min | 4h 14min | 3h 52min3 | 1h 42min | N/a | 3h 58min3 | 8h 01min | 5h 04min | 7h 43min | N/a | |||
| Brussels Midi/Zuid | N/a | N/a | 1h 50min | N/a | N/a | 3h 05min | N/a | N/a | N/a | N/a | N/a | N/a | N/a | |||
| Cologne/KĂśln Hbf 5 | 2h 37min | 4h 17min | 1h 50min | 1h 10min | 21min | 1h 01min3 | 3h 38min3 | N/a | 4h 32min | N/a | 2h 13min | 8h 52min | N/a | |||
| Dortmund Hbf | N/a | 3h 28min | N/a | 1h 17min | 49min | 2h 26min3 | 2h 49min | 11h 12min | 5h 35min | N/a | 3h 29min | 10h 07min | N/a | |||
| DĂźsseldorf Hbf | 2h 11min | 4h 14min | N/a | 21min | 48min | 1h 26min | 3h 06min | N/a | 4h 41min | N/a | 2h 28min | N/a | N/a | |||
| Frankfurt (Main) Hbf 5 | 3h 55min | 3h 39min3 | 3h 05min | 1h 04min3 | 2h 35min | 1h 26min | 3h 20min3 | N/a | 3h 09min | 3h 38min3 | 1h 18min3 | 6h 24min | 3h 53min | |||
| Hamburg Hbf 5 | N/a | 1h 42min | N/a | 3h 35min3 | 2h 47min | 3h 06min | 3h 20min3 | N/a | 5h 31min | N/a | 4h 59min | N/a | 7h 35min | |||
| Innsbruck Hbf | N/a | 7h 15min | N/a | 9h 48min | N/a | 10h 13min | 5h28min | N/a | 1h 49min | N/a | 4h 03min | N/a | N/a | |||
| MĂźnchen Hbf | 7h 09min | 3h 55min3 | N/a | 4h 32min | 5h 28min | 4h 44min | 3h 09min | 5h 31min | 1h 44min6 | 5h 34min | 2h 12min | 3h 56min | 3h 32min6 | |||
| Paris Gare de l'Est | N/a | 8h 08min | N/a | N/a | N/a | N/a | 3h 47min3 | N/a | N/a | 5h 34min | 3h 09min | N/a | N/a | |||
| Stuttgart Hbf | 5h 03min | 5h 04min | N/a | 2h 13min | 3h 25min | 2h 28min | 1h 17min3 | 4h 59min | 6h 17min | 2h 12min | 3h 09min | N/a | N/a | |||
| Vienna/Wien Hbf | N/a | 7h 40min | N/a | 8h 50min | 10h 06min | N/a | 6h 21min | N/a | N/a | N/a | N/a | N/a | N/a | |||
| ZĂźrich HB | N/a | 8h 39min | N/a | N/a | N/a | N/a | 3h 53min | 7h 35min | N/a | 3h 32min5 | N/a | N/a | N/a | |||
|
1 German category 1 stations and comparable international destinations of 250.000 passengers per day or more | ||||||||||||||||
References
[edit]- â "Europe's High-Speed Rail Leaders". The Globalist. 8 September 2018. Retrieved 5 October 2023.
- â Doll, Nikolaus (17 October 2017). "Warum Deutsche Bahn jetzt einen ECE auf dem Gleise schickt" (in German). Die Welt. Retrieved 26 October 2017.
- â "Transrapid-Teststrecke vor dem Abriss, NDR (in German)". Archived from the original on 2012-07-06. Retrieved 2017-10-10.
- â "NewsDetail". bahnprojekt-stuttgart-ulm.de.
- â Denis Bowers (15 June 2018). "Danish parliament approves DKr 11bn rolling stock purchase". International Railway Journal. Retrieved 26 June 2020.
- â Gernot KnĂśdler (18 June 2020). "Klatsche fĂźr Fehmarnbelt-Querung". Die Tageszeitung (in German). Retrieved 26 June 2020.
- â David Burroughs (7 February 2020). "Fehmarnbelt Fixed Link rail consultancy contract awarded". International Railway Journal. Retrieved 26 June 2020.
- â "Faser i arbejdet" (in Danish). Banedanmark. 22 May 2017. Retrieved 26 June 2020.
- â "Ausbaustrecke (ABS) HanauâGelnhausen" (in German). Deutsche Bahn. Retrieved 2024-05-19.
- â "Infrastrukturliste Deutschlandtakt" (in German). Deutsche Bahn. Retrieved 27 March 2022.
- â Bahnprojekt Ulm-Augsburg (2024-06-27). Bahnprojekt UlmâAugsburg: Ihre Fragen zur Vorschlagsvariante. Retrieved 2024-07-04 â via YouTube.
- â "Bahnprojekt Ulm-Augsburg" (in German). Deutsche Bahn. Retrieved 27 March 2022.