1. General Requirements
The problems that are to be solved in IP internet are mainly three:
Ghiselli, Salomoni & Vistoli [Page 1]
RFC 1676 INFN Requirements for an IPng August 1994
- transparency to the final user: user applications should not be influenced.
2. Application and Transport Level
Starting from the top of the OSI model, we think that the users applications should not be influenced by the migration plan. It means that the TCP (the transport layer) must maintain the same interfaces and services to the upper layers. Anyway, it is also necessary to foresee the use of a different transport services. The possibility to use different transport should be offered to the applications. Therefore a transport selector field is needed.
3. Network layer: service and address
We assume that the network layer must continue to provide the same datagram service as IP does. CLNS could be a solution and a reliable starting point for the IPng. The main advantage is that this solution has been profitable tested and it is already available on many systems. It is not, of course, deployed as widely as IPv4 is, since it is a newer technology, but it is widely configured and and there is already operational experience. The corresponding address, the NSAP, is 20 bytes long. It is long enough to scale the future data network environment. Its hierarchical format can be organized in a really flexible way, satisfying hierarchical routing and policy based routing needs and simplifying the distributed administration and management. A lot of work has been already done in the majority of the countries in order to define NSAP formats satisfying both the requirements of administrative delegation and routing performances.
4. Routing protocols
We don't consider the decision about the routing protocol to be adopted for the IPng to be fundamental. Even if this choice is very important to obtain good performances, the routing protocols can be changed or improved at any time, because there is no influence into the End Systems configuration. Relationships between NSAP aggregation, hierarchical topology and hierarchical routing algorithm must be taken into account in IPng plan. These issues could improve administration and topological flexibility of the IPng and solve the flat problem of the IPv4. The IPng routing protocols should include policy-based features. The IPv4 network topology is very complex and it will continue to enlarge during the transition. It would be very difficult or impossible to manage it without the "policy" tools. The multicast capability as well as any other new features that fit in a datagram network should be supported. Regarding the Source Routing feature, since we think that it deeply modifies the aim and the "philosophy" of a connectionless network and it also introduces an heavy complication in the end nodes and routers software, we don't consider it a major issue.
Ghiselli, Salomoni & Vistoli [Page 2]
RFC 1676 INFN Requirements for an IPng August 1994 5. Layer 2 or communication infrastructure media support.This is an open field, rapidly changing, then it must be left open to any evolution. What it should be recommended is to be compatible with the above network layer.
6. Transition and Deployment
We faced the problem of the transition of the DECNET global network to DECNET/OSI over CLNS. This activity is now proceeding to the last step and based on this experience we would underline some points that we found important during the transition deployment. The transitions must be planned and developed in a distributed way. This means that every organization should have the possibility to plan and start their network migration without loosing connectivity with the existing global internet. Of course, the compatibility with the IPv4 world must be maintained, this mean that a new generation system must interwork with both the IPv4 and IPng nodes, using the same applications.
Ghiselli, Salomoni & Vistoli [Page 3]
RFC 1676 INFN Requirements for an IPng August 1994
Security Considerations