Network Working Group J. McQuillan RFC #331 BBN-NET NIC #9924 19 April 1972 Category: B.1IMP System Change Notification
12 noon and 3 p.m. E.D.T. As discussed at the March 16 seminar held
at BBN, this release constitutes a major change to the IMP program. Because of the magnitude of the change, the system will be released on an experimental basis. If problems develop, then the current system, IMPSYS 2514, will be reloaded and the cutover for IMPSYS 2600 will be rescheduled for some later time.