Network Working Group Alex McKenzie RFC #374 BBN NIC 11099 19 July 1972There are two significant developments in the operation of the network which should be of interest to all sites:
[Page 1]
SITE POWER PROBLEMS
During the month of June, between 1/4 and 1/2 of the IMP down time was due to site power failure.